Case Study

Case Study: Delivering Class and Functionality for High End Building Upgrade
To ensure a safe environment for visitors and minimise any construction-related inconvenience, Shape faced the challenge of finding a suitable hoarding system to separate the construction area from the lobby. The task was further complicated by the building’s high ceiling of nearly 5 metres, requiring an easy-to-install solution that would ensure a professional appearance and blend seamlessly with the sleek furnishings in the lobby. The hoarding system also needed to be able to be relocated to a different area of the lobby after a few months.

Case Study: Dust Barrier Solution for Warehouse Construction Project
The large warehouse being constructed for Woolworths supermarket for picking and packing online grocery orders, was semi-open, which meant dust would become an issue. They needed to install a temporary barrier that could be easily repositioned and would restrict the movement of dust
throughout the site.

Case Study: Professional, Flexible and Budget Friendly Solution for On-site Amenities
Icon Constructions needed site amenities during construction for a period of 12 months in the basement including offices, lunchrooms, first aid area, toilets and change rooms. Icon required a smart, professional solution while keeping within their tight budget. The available area for the site amenities was challenged by many overhead pipes and cables that needed to be negotiated around. A typical demountable site shed would not fit in the basement. There didn’t seem to be an obvious solution until they discovered FastWall.

Case Study: Bespoke Window Protection Solution Saves Time, Cost and Risk
The client achieved substantial cost savings from not only the greatly reduced application time, but also the tape being easily removable - in some areas, eight months later - without residue issues.

Case Study: Mass Vaccination Centre With Over 70 Cubicles Set Up In Two Days
Responsive customer service and having available stock and expertise on hand meant that HD Constructions were able to deliver the project on time. As a result, all NSW HSC students were able to be vaccinated in preparation for their trial examinations.