Case Study: Hospital-Grade Protection for Operating Theatre Refurbishment
Working within an active hospital environment, the project demanded solutions that ensured minimal disruption, upheld Infection Prevention Control protocols, and allowed safe access for patients, staff and visitors.
Case Study: Tough Protection for New Data Centre
Taylor needed temporary protection solutions for a long-term data centre project that would last the full project duration. While it was in the demolition and groundwork stage, Taylor asked Protecta for expert advice on how to keep key areas protected throughout the entire build.
Case Study: Thinking Outside the Panels, Creative Hoarding Solutions
JDV Projects undertook a fit-out at 637 Flinders Street, facing two key challenges: safeguarding the original carpet tiles from construction wear and tear, and creating a lightweight, reusable, and easy-to-clean temporary lunchroom. But it didn’t stop there. Discover how they took it a step further...

Case Study: Custom Protection Solution for Prefabricated Mullions in 6 Star Green Star Building Project
To maintain the building’s 6 Star Green Star rating, no painting or touch-ups were allowed on-site after installation. This created a significant challenge in protecting the pre-finished mullions during transportation and throughout the construction process to prevent any damage, as replacing or repairing the columns after installation was not feasible.
Case Study: Cost-Effective and Sustainable Solutions for ENEX 100 Revamp
The ENEX 100 project involved major refurbishments in a busy public area, requiring careful work zone segregation, robust floor protection, and minimal disruptions. Robust floor protection was essential for heavy equipment like scissor lifts on finished surfaces, including stone tiles and polished timber, all while avoiding disruption to the outside area.