Protecta Board XTRA Custom Profile
![Case Study: Custom Protection Solution for Prefabricated Mullions in 6 Star Green Star Building Project](https://protecta.syd1.digitaloceanspaces.com/media/mageplaza/blog/post/1/7/1723099029809_no_cross_1.jpg)
Case Study: Custom Protection Solution for Prefabricated Mullions in 6 Star Green Star Building Project
To maintain the building’s 6 Star Green Star rating, no painting or touch-ups were allowed on-site after installation. This created a significant challenge in protecting the pre-finished mullions during transportation and throughout the construction process to prevent any damage, as replacing or repairing the columns after installation was not feasible.
![Protecta Tip #25: Safeguard Thresholds Effectively](https://protecta.syd1.digitaloceanspaces.com/media/mageplaza/blog/post/m/a/magento_display_image_400_x_400_px_v5.jpg)
Protecta Tip #25: Safeguard Thresholds Effectively
As the primary access points on site, thresholds can be challenging to protect, requiring a solution to protect the threshold from high construction traffic while being easily removable.
![Case Study: Preserving Australian Heritage One Step at a Time](https://protecta.syd1.digitaloceanspaces.com/media/mageplaza/blog/post/resize/400x/m/a/magento_thumbnail.jpg)
Case Study: Preserving Australian Heritage One Step at a Time
A new skylight needed to be installed directly above the iconic marble staircase. The foyer and staircase are a popular thoroughfare for staff and visitors to Parliament House. Therefore, the installation needed to be completed in a short time frame to minimise disruption.