Case Study: Professional, Flexible and Budget Friendly Solution for On-site Amenities

Case Study: Professional, Flexible and Budget Friendly Solution for On-site Amenities

Project Details

Icon Constructions - Park One, Macquarie Park NSW

Products Used

Key Outcomes

  • Flexible system was simple to work with in awkward spaces
  • Fast installation enabled Icon to commence the project sooner
  • Cleanable surface for optimised hygiene

Background

Park One was a $148 Million development consisting of 412 designer apartments across two buildings, three retail tenancies, three basement car park levels and landscaping including courtyards and a rooftop terrace.

Challenge

Icon Constructions needed site amenities during construction for a period of 12 months in the basement including offices, lunchrooms, a first aid area, toilets and change rooms. Icon required a smart, professional solution while keeping within their tight budget. The available area for the site amenities was challenged by many overhead pipes and cables that needed to be negotiated around. A typical demountable site shed would not fit in the basement. There didn’t seem to be an obvious solution until they discovered FastWall.

Park One Case Study 1

FastWall meets the challenge of building amenities in tight spaces with ease.

Solution

Protecta Group proposed the innovative FastWall system to construct the necessary amenities in the tight space in a minimum amount of time. The project required over 1,600 panels of FastWall which were installed quickly and efficiently, including cutting around obstructions. Vinyl flooring completed the smart and professional presentation of the temporary site facilities.

Park One Case Study FastWall 2

FastWall used to create specialised rooms onsite. 

Final Result

The finished result included several offices, toilets, and change rooms as well as a large lunchroom
at a lower cost due to the innovative tongue and groove design. The significant time and labour savings achieved with faster installation than traditional hoarding systems enabled a streamlined project delivery.

Download full Case Study

Park One Case Study FastWall 3

The smart pre-finished panels are made from durable and weatherproof PVC for optimised hygiene.